Products & Solutions > Hard Disk Drive Test Equipment

- Engineering, design and total system integration for HDD related tooling, fixture and equipment.
- Replication of HDD production machine and test equipment.


BTS Manufacturing Services:

  • Spare parts
  • Tooling/ fixture
  • Equipment modification
  • Precision module Assembly
  • PCBA Assembly and Test

Self Servo Writer
Self Servo Writer

To perform servo writing function on hard disk drive, provide electrical connection test on drive prior to perform burn-in test.

CCT TESTER
CCT TESTER

Process Function:
    - Customer request feature setting and drive
       function & quality checking based on different
       customer, HDD label print and stick
    - User level (SATA II) interface testing
Tester Function:
    - Total 40ea test port
    - HDD SATA interface communication
    - Each Port PC control 4ea HDD
    - Power distribution card control power on/off
       switch
    - Port load/unload cylinder control combo in
       power card
    - Host PC control all port PC testing and monitor
       HDD test results
    - Tester operation system use Windows XP SP2
    - Send test results to FIS network
Test Time:
    - Target  time is 10 minutes


STR Tester
STR Tester

Process Function:
    Check the HDA basic mechanical assembly work
    function and servo write signal verify
Tester Function:
    - Total 256ea test port
    - Serial port communication
    - One host PC control 256 ports
    - Host software control & monitor HDD test
      status by port
    - Control port power on/off
    - High temp capability, control range around
       25-60 °C
    - JIG size reference to HDD size
    - Tester operation system use Windows XP SP2
    - Send test results to FIS network
Test Time:
    - 30 hours including servo copy


HDAT Tester
HDAT Tester

Process Function:
    - Drive self test process, control drive quality &
      function test
Tester Function:
    - Total 32ea test port
    - Serial Port communication
    - 1 HOST PC control 32 port HDA testing
    - Software control HDA JIG load/unload
    - Back plan board control port power on/off
      and distribution communication
    - Scan HDA P/N and write on media
    - Send test results to FIS network
Test Time:
    - Target  time is 10 minutes each HDD